Your agent, your lawyer, your engineer: who checks what

The lawyer checks the contract and the title. The engineer checks the building. The agent introduces the sale. None of the three watches construction over time, and the gap between signing and handover is where buyers assume somebody is and nobody is.

The division, and the gap

WhoChecksDoes not check
AgentAvailability, price, the marketAnything after the sale completes
LawyerTitle, permits, contract terms, completionWhat is physically built at any point
An engineer you engageThe building, on the day they visitWhat happened between visits, and what is normal for the stage
Nobody, by defaultNothingThe two years between signing and handover

Why the gap is invisible until it matters

Each party does their job properly and each job ends at a boundary. The lawyer's work finishes when the contract is signed and resumes at completion. The agent's finishes at the sale. The engineer's begins when somebody engages them, which is usually near handover, if at all.

Buyers rarely notice because the developer's updates fill the silence. They arrive regularly and look like somebody watching, and they are neither independent nor comparable.

Where the agent conflict sits

An agent paid by commission on this sale, in a market where the same developers supply most of the stock, is not structurally placed to tell you the build is going badly. This is not an accusation of dishonesty; it is a description of whose interest the arrangement serves.

The same applies to a lawyer introduced by the agent who was introduced by the developer. Convenience and representation are different products.

What to arrange, and when

  1. 01Before signing: your own lawyer, unconnected to the sale, in the country of the property.
  2. 02Before signing: access and information rights in the contract, which are much harder to add later.
  3. 03During construction: a regular record by somebody with no relationship to the developer.
  4. 04Before walls close: somebody who looks at services and structure while they are still visible.
  5. 05Before acceptance: a defect list against the specification, and objections recorded on the document you sign.

Questions on this

Can my lawyer handle the construction side too?

Some firms will arrange a technical visit. It is coordination rather than expertise, and it is worth knowing which one you are paying for.

Is the agent useless after the sale?

No. A good agent stays useful for local logistics and for pressure on the developer. They are simply not a source of independent information about the build.

What if the developer supplies an engineer's report?

Read it, keep it, and note who engaged the engineer. A report commissioned by the party it assesses answers a different question from one commissioned by you.

Read one before you buy one

The specimen shows the whole structure: status, what each payment was meant to buy, the forecast with its range, the photographic record and the limits of what was checked.